Friday, November 13, 2015

Remodeling progresses

Yesterday I drove back up to Camden, South Carolina to help with flooring and setting cabinets. It was a long day. I left Tybee Island at 7:00 a.m. and got back at 10:15 p.m.  Here is how things progressed during the day.

We started by placing those two by fours on the wall as a guide to level the cabinets. The corner cabinet went in first. The short cabinet is over the stove and will have the microwave over hung below it.
This is Abby. She was our supervisor for the day. It is important to have your work approved. 

This is looking the other direction.

More cabinets up and Carol's mom is cleaning up after us. We aren't much on cleaning but great at creating dust and scraps. 

Refrigerator back in place after cabinets are set.

Stove check to make sure everything fits. 

Sink base cabinet installed and other cabinets placed along with dishwasher to be sure layout is right. The other base cabinets will need to be screwed together, dishwasher plumbed and powered, countertop, sink, and faucets installed and trim work done. Rob should be able to handle all that alone but if another trip is needed I will head north to South Carolina. Saying that always amuses me. North to South Carolina. Not something I ever thought I would say often. 